PPK Workshop

Workshop briefing · 25 November 2026

AI and the
near future.

What might happen by 2030 as AI grows more capable? Explore the opportunities, the dangers, and the physical limits of building it at scale.

Explore the scenarios
Data centres and the infrastructure that powers them · Illustration
Global private AI investment in 2025
$344.7bn
Global data centre electricity use in 2030, IEA projection
950 TWh
Helion Orion’s target for initial operations
2028

2026–2030 outlook

Three plausible paths

Here, superintelligence means AI that reliably outperforms the best humans across most cognitive tasks. Its arrival by 2030 is uncertain. These scenarios carry no probability estimates.

Steady progressHumans still supervise most complex work

AI becomes a routine assistant in offices, schools and labs. Some tasks get cheaper, while reliability, integration and regulation slow wider adoption. Productivity gains vary by sector.

Watch for: independent studies showing sustained time savings after accounting for review, corrections and integration costs.

Fast deploymentAI handles longer projects with less oversight

Reliable agents take on parts of software development, administration and research. Some teams deliver more with fewer people, and narrower entry-level hiring makes it harder to gain experience. Firms with access to computing and distribution gain leverage.

Watch for: agents independently completing unfamiliar multi-day projects, alongside sustained shifts in junior hiring and AI spending.

A superintelligence breakthroughHighly uncertain and potentially transformative

If AI surpasses top experts across domains and helps advance AI research itself, some discoveries could arrive faster. Experiments, manufacturing and clinical trials still take time. Giving such systems broad autonomy could make oversight harder precisely when mistakes or misuse become more consequential.

Watch for: independently reproduced research breakthroughs across fields and credible evaluations of whether people can constrain or stop advanced systems. Safety report

Society and safety

What’s at stake

How quickly a capability spreads and who controls its use may matter as much as the capability itself.

What could go right

Faster research

AI can help researchers choose which hypotheses to test. AlphaFold 3 is one published example in molecular structure prediction. Lab work and clinical trials still determine whether a candidate treatment works. Nature

More accessible education

Low-cost tutors could offer practice, translation and feedback at any hour. Educators can assess learning gains, factual accuracy and how well the tools serve different students.

More productive teams

In one study of 5,179 customer support agents, AI assistance raised issues resolved per hour by 14% on average, with larger gains for newer and less-skilled workers. NBER

What deserves attention

Harms already visible

Voice cloning and fabricated media can aid fraud. AI can scale cyber abuse, and unreliable outputs can distort decisions in hiring, education or public services. Independent verification and appeal processes matter. Safety report

Power and opportunity concentrate

A few companies may control the chips, cloud platforms and models that others depend on. Job redesign could bring productivity gains while leaving some workers with fewer routes into a profession. ILO

Extreme risks from greater autonomy

More capable systems could lower barriers to severe misuse. Loss of control is a separate, hypothetical risk. Its likelihood is disputed and current evidence is limited. Independent evaluations, restricted permissions and tested shutdown procedures can inform deployment decisions. Safety report

Economy and infrastructure

What it takes to scale

AI needs chips, buildings, cooling and reliable electricity. Each has its own cost and lead time.

The investment race

Stanford HAI counted $344.7 billion in global private AI investment in 2025, including $285.9 billion in the United States. The IEA separately estimated that capital expenditure by the largest technology companies exceeded $400 billion in 2025. These measures track different activity and should not be added together. Stanford HAI · IEA

Infrastructure pays off if customers keep buying enough AI services to cover hardware, financing and power costs. If demand disappoints or chips age faster than expected, expensive capacity can sit idle. If adoption accelerates, scarce grid connections and chips can give incumbent firms more pricing power.

The ILO estimates that about one in four workers worldwide holds a job with some exposure to generative AI. Exposure measures the potential for tasks to change. Actual employment effects depend on adoption, demand and workplace choices. ILO

Data centres could nearly double their electricity use

Annual global electricity consumption

2025 Estimate485 TWh
2030 Projection950 TWh

The IEA projects about 3% of global electricity demand in 2030 for all data centres, including AI and other digital services. IEA

Local grids feel the pressure first

Large loads cluster in a few regions. Where grid connections lag, projects may be delayed or turn to on-site gas. Cooling can also put pressure on local water supplies. Efficiency helps, though cheaper computing can encourage more use. IEA · European Commission

Fusion watch · Malaga, Washington

Microsoft’s fusion deal

Microsoft agreed to buy electricity from Helion’s Orion project in 2023. Helion is building the plant and plans to operate it. If Orion can deliver reliable net electricity to the grid, it could be among the first commercial fusion plants. Helion

  1. Power purchase agreement

    Helion announces Microsoft as the buyer, with Constellation as power marketer.

  2. Site construction begins

    Helion starts work near Malaga in Chelan County, Washington.

  3. Generator building and licenses

    Helion reports construction of the generator building and receipt of two state radiation-related licenses.

  4. Initial operations

    Helion targets initial operations in 2028 and at least 50 MW after ramp-up. Reliable net exports and full output remain to be demonstrated.

How much could one plant supply?

A 50 MW plant running flat out for a year could deliver about 0.44 TWh, under 0.05% of projected 2030 global data centre electricity use. A successful first plant would be an engineering milestone. Broad impact would require many plants that can be built and run economically.

Why ITER has a different timeline

France’s ITER is a research facility designed to study fusion under power-plant-like conditions. Its plan targets research operations in 2034 and deuterium–tritium operations in 2039. ITER is designed for experiments and will draw electricity from the grid. ITER

Milestones to watch: independently verified net electrical output across the whole plant, first grid exports, reliable operation and the cost of repeating the design.

Further reading

Sources and assumptions

Figures and project milestones were checked on 25 November 2026. The scenarios are discussion material and the fusion calculator uses a simplified annual-output formula.